Installation And Commission Procedure:
- The concrete platform is prepared with concrete having a mixing ratio of cement: sand: aggregate, with a water-cement ratio, and the fixing arrangements shall be done for the compression testing machine, such as bolting or welding rods, placed in the concrete. Curing is done for 28 days.
Preparation Of Platform:
- Placing of the compression testing machine on the concrete platform and fixing is done.–Initial setup is carried out, such as cleaning the connection and calibration
- Power to plug in, Calibration to conduct.
- CTMis ready for testing.